Declassified Archive

Mission Files

Operational documents from the We Hear You series, released under Article 14 transparency provision. Partial redactions apply. Additional files remain classified.

8 FILES · 4 RELEASED · 4 PENDING
Book One · The Ganymede Transmission

Selected operational documents from the 2047 Ganymede Transmission Mission, released under Article 14 transparency provision. Partial redactions apply. Additional files remain classified.

4 FILES·2044 — 2047·CLEARANCE 4 — 5
FILE 01 · BTC/DSD/VSL-04 · REV.7
CLEARANCE 4 14.MAR.2047
Rømer vessel schematic cutaway

Rømer

Interplanetary Vessel · Deep Space Division

Commissioned for the 2047 Ganymede Transmission Mission, the Rømer is a modified VSL-class deep-space transport retrofitted for a four-hundred-twenty-two-day trajectory to Jupiter. Ninety meters stem to stern. VASIMR plasma drive. Three-person crew. One shuttle. One onboard intelligence. One classified payload she was not told the full purpose of. Current revision reflects the March 2047 departure configuration.

Crew Assigned
ELIAS · VOLKOV · KOWALSKI · REEVES · LUCI
VIEW AT FULL RESOLUTION ↗
FILE 02 · BTC/ASD/ARC32 · REV.3
CLEARANCE 5 22.FEB.2047
ARC32 payload schematic

ARC32

Quantum Relay Module · Advanced Systems Division

A 184-kilogram payload module designed to attach to the existing DSOC installation on Ganymede and upgrade it to quantum-entanglement protocols. Once active, it will extend Earth's communications grid across the entire solar system — and render every existing relay in Bode Telecom's inventory immediately and permanently more valuable. Specifications classified. Quantum core architecture classified. Nearly everything about this document is classified. What it does is not: it rewrites the infrastructure of communication for the species.

Primary Handlers
REEVES · KOWALSKI
VIEW AT FULL RESOLUTION ↗
FILE 03 · BTC/DSD/GRND-DSOC-01 · REV.12
CLEARANCE 4 UPDATED 14.MAR.2047
DSOC ground installation schematic

DSOC Installation · Site JGA-01

Ground-Based Transmission Array · Ganymede Surface

The Deep Space Optical Communications installation deployed on Ganymede's sulci terrain in July 2044 during Bode Telecom's first crewed Ganymede mission. Two-point-four-meter optical transmission aperture. Neptune5 two-gigawatt thermal reactor. The installation suffered a loss of signal on mission day forty-seven that was never fully explained in the original incident report, and was restored — by means the Company chose not to document — before the surviving crew departed. This schematic was last updated in March 2047 in preparation for the Rømer's arrival.

Primary Handlers
REEVES · LUCI · (2044:  REDACTED )
VIEW AT FULL RESOLUTION ↗
FILE 04 · BTC/MPD/GAN-2047 · REV.4
CLEARANCE 4 11.JAN.2047
Mission trajectory schematic

Mission Trajectory

Earth → Jupiter → Ganymede · Mission Planning Division

Hohmann transfer trajectory plotted for minimum delta-v. Launch 18 March 2047. Belt transit at day one-eighty. Jupiter orbital insertion at day four-ten. Ganymede rendezvous at day four-twenty-two. Insertion burn 1,842 meters per second. Return window opens 17 September 2048 and closes 3 October 2048 — a sixteen-day window. A second approach vector, filed as Rival / Chirikov Approach Vector, is dashed on the same diagram. The Chirikov's arrival time is redacted in this release.

Primary Handlers
ELIAS · VOLKOV · LUCI
VIEW AT FULL RESOLUTION ↗
Book Two · The Second Signal

Four further documents have been identified for release. Each remains under declassification review.

FILE 05 · PRC/HSD/CNS-02    
CLASSIFIED DATE WITHHELD

File 05 ·             

Transcript · Book Two

This document has been identified for release and is pending declassification review. Title, originating division and handlers are withheld until the review closes.

Primary Handlers
  REDACTED  
NOT YET RELEASED
FILE 06 · BTC/LGL/OPS-01    
CLASSIFIED DATE WITHHELD

File 06 ·             

Memorandum · Book Two

This document has been identified for release and is pending declassification review. Title, originating division and handlers are withheld until the review closes.

Primary Handlers
  REDACTED  
NOT YET RELEASED
FILE 07 · PRC/ARD/GEN-04    
CLASSIFIED DATE WITHHELD

File 07 ·             

Facility · Book Two

This document has been identified for release and is pending declassification review. Title, originating division and handlers are withheld until the review closes.

Primary Handlers
  REDACTED  
NOT YET RELEASED
FILE 08 · PRC/SLV/    
CLASSIFIED DATE WITHHELD

File 08 ·             

Vessel · Book Two

This document has been identified for release and is pending declassification review. Title, originating division and handlers are withheld until the review closes.

Primary Handlers
  REDACTED  
NOT YET RELEASED
The People in These Files
Book One · Crew of the Rømer